Cost of Nandipur Power Project skyrockets to Rs 84 billion

So, in 2013 Nawaz Shareef told us that cost of the project is 57 billion and 1 years later it becomes 84 billions (increase of 27 billions only). Managing director of the project was on TV trying to fool awam that price is still 57 billion and you are seeing it as 84 becasue of change of price of $.

Ullu k pathey, your finance minister take it as feather in his cap to bring the $ rate down by 3-4 RS. So if anything project cost should actually go down.

There goes 27 billion (more) of tax payers money in someone’s pocket

So After Raja Rental, what should this be called? Nawaz Multiplier Shareef?


Cost of Nandipur Power Project skyrockets to Rs84 billion](http://www.dawn.com/news/1132141)

ISLAMABAD: Amid heavy criticism, the cost of the Rs27 billion Nandipur Power Project is now a staggering Rs84bn, making it the most expensive power project in Pakistan.

A copy of official documents, available with DawnNews, show that the cost of Nandipur Power Project has gone up from Rs57bn to reach Rs84bn. According to the PC-I of the project, the original cost was set at Rs22bn. However, due to a delay of seven years in the completion of the project, the cost went up. The PML-N government then revised the cost during 2013, jacking it up by Rs35bn and fixing it at Rs57.4bn.

When contacted by DawnNews, Managing Director Nandipur Power Project Muhammad Mehmood, expressed surprise about the increase in cost.
He further said that he was unable to respond at the moment as to how National Electric Power Regulatory Authority (Nepra) had determined the project cost at Rs84bn.

According to the MD, cost of the project currently stands at Rs57billion.

It merits mentioning here that official documents detailing the project cost was forwarded to Nepra after the necessary alleged approval of the MD.
However, Mehmood said he was unaware about the actual cost, which was mentioned on page 13 of the official document.

The document states that Engineering, Procurement and Construction (EPC) cost and related cost was $502.318m, Taxes & Duties $21.773m, Emergency Spare parts $ 15.00m, O&M Mobilisation $5.00m, Non-EPC Construction $56.750m, Financial Fees & Charges $16.838, Interest during Construction (IDC) $229.491million. In this way, the total cost stands at $847.016million.

Recently, the Northern Power Generation Company (NPGC) had sought approval from Nepra to fix the power tariff of the project for 30 years at Rs18.16 per unit with furnace oil, Rs27.91/unit with high speed diesel (HSD) and Rs8.44/unit with gas.

Sources in the water and power ministry said Nepra, the power sector regulator, was perturbed over the increase in project cost and its tariff rate.
Sources said few members and officials of the authority were upset by the said raises in tariff and cost of the power project and were not in favour to pass on the additional burden to the power consumers.

On finding a plea from NPGC, Nepra in a bid to approve tariff in the light of stakeholder’s opinion/comments has advertised 13 questions and sent them to all stake holders including ministries of power, finance, planning, Sui Southern Gas Company Limited, Sui Northern Gas Pipelines Limited, Consumers Protection Associations etc.

Re: Cost of Nandipur Power Project skyrockets to Rs 84 billion

ise aap ‘taraqqi’ kah leN…bhale hii vo qeematoN meN izaafa hii kiuN na ho! taraqqi taraqqi hotii hai chaahe vo productivity ho yaa chaahe qeematoN meN izaafa! :hmmm:

Re: Cost of Nandipur Power Project skyrockets to Rs 84 billion

The best part is its still not working

Re: Cost of Nandipur Power Project skyrockets to Rs 84 billion

Yaar please D6C, you are such a party pooper. Aakhir UN trip pe jo extra kharcha ho gaa, oos ko kaheen tou adjust kerna hai naa

Re: Cost of Nandipur Power Project skyrockets to Rs 84 billion

84 billion for producing electricity at the cost of rs 40/unit? What happened to its twin brother chichu ki Malian?

Re: Cost of Nandipur Power Project skyrockets to Rs 84 billion

And i rmember some post in the past saying this is a miracle of human somethingxxxxxxxxxxxxxxxxxxx

Re: Cost of Nandipur Power Project skyrockets to Rs 84 billion

Nepra allows 29 paisa per unit cut in tariff - Pakistan - DAWN.COM

Mr Mahmood requested the regulator to approve a diesel-based reference tariff of Rs41 per unit, furnace oil tariff of Rs27 and gas-based tariff of Rs12.5 per unit.
Nepra officials asked why the project cost was being verbally quoted at Rs57 billion when official documents put the cost at $847 million.

Re: Cost of Nandipur Power Project skyrockets to Rs 84 billion

why on earth we need electricity at this cost of 41 when furnace oil cost is much lesser ???

Let's blame it on IK & TuQ.
Easiest way out.
ہم نے موٹروے بنائی
ہم نے چھوٹے والا کمپیوٹر دیا
ہم نے جنگلا بس دی
اور اب ہم آپ کو پاکستانی تاریخ کا سب سے مہنگا بجلی گھر دیتے ہیں.

جاہلوں کی تالیاں
شیر آیا شیر
میاں دے نعرے

fade to black

Re: Cost of Nandipur Power Project skyrockets to Rs 84 billion

Perhaps they were too expensive to obtain from Maulana Diesel?

Re: Cost of Nandipur Power Project skyrockets to Rs 84 billion

:emmy: @desert_bird
#Registani_Parinda](http://www.paklinks.com/gs/usertag.php?do=list&action=hash&hash=Registani_Parinda) hazir ho…

Re: Cost of Nandipur Power Project skyrockets to Rs 84 billion

and worst thing is k kisi ko kuch pata hee nahi hai k 27 billions only price increase ho gaee hai aur kaisye ho gaee hai. Our Jamhoriyat k thaikedar like Mahmood Achakzaiee, Fazlu, PPP etc are all quiet on this. Assembly's joint session has nothing to say on this.

Democracy zindabaad