Toronto Subway System shuts down causing rush-hour chaos

**
yea…koi lauTaa de mire beete huye din :frowning:

the contractor was responsible to have directed his men to start cuttingh concrete road just above the tunnel…he didn’t know that as he claims. now there must be a sign that says:

call TTC b4 u cut!!! :hehe:**