Statistical Comparison Between Musharraf and Preceding Governments

Energy crisis?

::::::

SABAKZAI DAM PROJECT

MIRANI DAM PROJECT

MANGLA DAM RAISING PROJECT

THAL FLOOD WATER CANAL

RAINEE CANAL PROJECT

BASHA DIAMER DAM PROJECT

SATPARA DAM PROJECT

SEHWAN BARRAGE COMPLEX PROJECT

GREATER THAL CANAL PROJECT

SANJWAL DAM

KURRAM TANGI DAM PROJECT

KALAM

NAULANG DAM PROJECT

HINGOL DAM PROJECT

CHASHMA RIHGT BANK CANAL PROJECT

RAINEE CANAL PROJECT

AKHORI DAM

GAJ NAI DAM

KALABAGH

YUGO

SKARDU DAM PROJECT

BAHTAR

DHOK PATHAN

ROHTAS

KHADIJI

GOMAL ZAM DAM PROJECT

MITHANKOT BARRAGE/ KACHHI CANAL PROJECT

KACHI CANAL PROJECT (KCP)

RIGHT BANK OUT FALL DRAINAGE PROJECT (STAGE-1) (RBOD-I)

BALOCHISTAN EFFLUENT DISPOSAL INTO RBOD (RBOD-III)

CONSTRUCTION OF 444 DRAINAGE TUBEWELLS IN MIRPUR KHAS (UNDER NDP)

WINDER STORAGE DAM PROJECT.

SUKLEJI DAM PROJECT

NAI GAJ DAM PROJECT

CHASHMA JHELUM LINK CANAL PROJECT.

(WAPDA)


All initiated under Musharraf’s era. Go ahead, click on the link, and check the dates when they were initiated.

The total estimated cost of the major dams is over $32b.


Water Sector Projects

  1. AKHORI DAM
  2. BAHTAR
  3. BALOCHISTAN EFFLUENT DISPOSAL INTO RBOD (RBOD-III)
  4. BASHA DIAMER DAM PROJECT
  5. CHASHMA JHELUM LINK CANAL PROJECT
  6. CHASHMA RIHGT BANK CANAL PROJECT
  7. CONSTRUCTION OF 444 DRAINAGE TUBEWELLS IN MIRPUR KHAS (UNDER NDP)
  8. DHOK PATHAN
  9. GOMAL ZAM DAM PROJECT
  10. GREATER THAL CANAL PROJECT
  11. HINGOL DAM PROJECT
  12. KACHI CANAL PROJECT (KCP)
  13. KALABAGH
  14. KALAM
  15. KHADIJI
  16. KURRAM TANGI DAM PROJECT
  17. MANGLA DAM RAISING PROJECT
  18. MIRANI DAM PROJECT
  19. MITHANKOT BARRAGE/ KACHHI CANAL PROJECT
  20. NAI GAJ DAM PROJECT
  21. NAULANG DAM PROJECT
  22. RAINEE CANAL PROJECT
  23. RIGHT BANK OUT FALL DRAINAGE PROJECT (STAGE-1) (RBOD-I)
  24. ROHTAS
  25. SABAKZAI DAM PROJECT
  26. SANJWAL DAM
  27. SATPARA DAM PROJECT
  28. SEHWAN BARRAGE COMPLEX PROJECT
  29. SKARDU DAM PROJECT
  30. SUKLEJI DAM PROJECT
  31. THAL FLOOD WATER CANAL
    32. WINDER DAM PROJECT
  32. YUGO

Hydropower Projects

  1. ABBASIAN
  2. ALLAI KHWAR HYDROPOWER PROJECT
  3. AZAD PATAN4. BASHO HYDROPOWER PROJECT](http://www.wapda.gov.pk/vision2025/htmls_vision2025/basho.html)
  4. BUNJI HYDROPOWER PROJECT
  5. CHAKOTHI
  6. CHASHMA HYDROPOWER PROJECT
  7. CHOR NULLAH SYSTEM
  8. COMBINED CYCLE
  9. DASU HYDROPOWER PROJECT
  10. DOYIAN
  11. DUBER KHWAR HYDROPOWER PROJECT
  12. GOLEN GOL HYDROPOWER PROJECT
  13. GULPUR
  14. HARPO HYDROPOWER PROJECT
  15. JABBAN HYDROPOWER PROJECT
  16. JINNAH HYDROPOWER PROJECT
  17. KALABAGH
  18. KAROT
  19. KEYAL KHAWAR HYDROPOWER PROJECT
  20. KHAN KHAWAR HYDROPOWER PROJECT
    22.KOHALA HYDROPOWER PROJECT
  21. LAKHRA COAL
  22. LAWI HYDROPOWER PROJECT
  23. MAHL
  24. MALAKAND
  25. MATILTAN
  26. MUNDA
  27. NARAN
  28. NEELUM -JHELUM HYDROELECTRIC PROJECT
  29. NEW BONG/ UJC32. PALAS VALLEY HYDROPOWER PROJECT
    33.PATAN HYDROPOWE PROJECT
  30. PATRIND
  31. PEHURE HIGH LEVEL HYDROPOWER PROJECT
    36. PHANDAR HYDROPOWER PROJECT](http://www.wapda.gov.pk/vision2025/htmls_vision2025/phandar.html)
  32. RAJDHANI
  33. SPAT GAH SYSTEM
  34. SUKI KINARI
  35. SUMMAR GAH HYDROPOWER PROJECT
  36. THAKOT HYDROPOWER PROJECT
  37. THAR COAL / GAS
  38. YULBO HYDROPOWER PROJECT

All of these projects were planned/initiated after Musharraf came in to power. Should I blame the previous governments for not realizing Pakistan’s power/water problems?