Energy crisis?
::::::
SABAKZAI DAM PROJECT
MIRANI DAM PROJECT
MANGLA DAM RAISING PROJECT
THAL FLOOD WATER CANAL
RAINEE CANAL PROJECT
BASHA DIAMER DAM PROJECT
SATPARA DAM PROJECT
SEHWAN BARRAGE COMPLEX PROJECT
GREATER THAL CANAL PROJECT
SANJWAL DAM
KURRAM TANGI DAM PROJECT
KALAM
NAULANG DAM PROJECT
HINGOL DAM PROJECT
CHASHMA RIHGT BANK CANAL PROJECT
RAINEE CANAL PROJECT
AKHORI DAM
GAJ NAI DAM
KALABAGH
YUGO
SKARDU DAM PROJECT
BAHTAR
DHOK PATHAN
ROHTAS
KHADIJI
GOMAL ZAM DAM PROJECT
MITHANKOT BARRAGE/ KACHHI CANAL PROJECT
KACHI CANAL PROJECT (KCP)
RIGHT BANK OUT FALL DRAINAGE PROJECT (STAGE-1) (RBOD-I)
BALOCHISTAN EFFLUENT DISPOSAL INTO RBOD (RBOD-III)
CONSTRUCTION OF 444 DRAINAGE TUBEWELLS IN MIRPUR KHAS (UNDER NDP)
WINDER STORAGE DAM PROJECT.
SUKLEJI DAM PROJECT
NAI GAJ DAM PROJECT
CHASHMA JHELUM LINK CANAL PROJECT.
(WAPDA)
All initiated under Musharraf’s era. Go ahead, click on the link, and check the dates when they were initiated.
The total estimated cost of the major dams is over $32b.
Water Sector Projects
- AKHORI DAM
- BAHTAR
- BALOCHISTAN EFFLUENT DISPOSAL INTO RBOD (RBOD-III)
- BASHA DIAMER DAM PROJECT
- CHASHMA JHELUM LINK CANAL PROJECT
- CHASHMA RIHGT BANK CANAL PROJECT
- CONSTRUCTION OF 444 DRAINAGE TUBEWELLS IN MIRPUR KHAS (UNDER NDP)
- DHOK PATHAN
- GOMAL ZAM DAM PROJECT
- GREATER THAL CANAL PROJECT
- HINGOL DAM PROJECT
- KACHI CANAL PROJECT (KCP)
- KALABAGH
- KALAM
- KHADIJI
- KURRAM TANGI DAM PROJECT
- MANGLA DAM RAISING PROJECT
- MIRANI DAM PROJECT
- MITHANKOT BARRAGE/ KACHHI CANAL PROJECT
- NAI GAJ DAM PROJECT
- NAULANG DAM PROJECT
- RAINEE CANAL PROJECT
- RIGHT BANK OUT FALL DRAINAGE PROJECT (STAGE-1) (RBOD-I)
- ROHTAS
- SABAKZAI DAM PROJECT
- SANJWAL DAM
- SATPARA DAM PROJECT
- SEHWAN BARRAGE COMPLEX PROJECT
- SKARDU DAM PROJECT
- SUKLEJI DAM PROJECT
- THAL FLOOD WATER CANAL
32. WINDER DAM PROJECT - YUGO
Hydropower Projects
- ABBASIAN
- ALLAI KHWAR HYDROPOWER PROJECT
- AZAD PATAN4. BASHO HYDROPOWER PROJECT](http://www.wapda.gov.pk/vision2025/htmls_vision2025/basho.html)
- BUNJI HYDROPOWER PROJECT
- CHAKOTHI
- CHASHMA HYDROPOWER PROJECT
- CHOR NULLAH SYSTEM
- COMBINED CYCLE
- DASU HYDROPOWER PROJECT
- DOYIAN
- DUBER KHWAR HYDROPOWER PROJECT
- GOLEN GOL HYDROPOWER PROJECT
- GULPUR
- HARPO HYDROPOWER PROJECT
- JABBAN HYDROPOWER PROJECT
- JINNAH HYDROPOWER PROJECT
- KALABAGH
- KAROT
- KEYAL KHAWAR HYDROPOWER PROJECT
- KHAN KHAWAR HYDROPOWER PROJECT
22.KOHALA HYDROPOWER PROJECT - LAKHRA COAL
- LAWI HYDROPOWER PROJECT
- MAHL
- MALAKAND
- MATILTAN
- MUNDA
- NARAN
- NEELUM -JHELUM HYDROELECTRIC PROJECT
- NEW BONG/ UJC32. PALAS VALLEY HYDROPOWER PROJECT
33.PATAN HYDROPOWE PROJECT - PATRIND
- PEHURE HIGH LEVEL HYDROPOWER PROJECT
36. PHANDAR HYDROPOWER PROJECT](http://www.wapda.gov.pk/vision2025/htmls_vision2025/phandar.html) - RAJDHANI
- SPAT GAH SYSTEM
- SUKI KINARI
- SUMMAR GAH HYDROPOWER PROJECT
- THAKOT HYDROPOWER PROJECT
- THAR COAL / GAS
- YULBO HYDROPOWER PROJECT
All of these projects were planned/initiated after Musharraf came in to power. Should I blame the previous governments for not realizing Pakistan’s power/water problems?